Kungsleden – EA Rosengrens Gata
An office building in southern Gothenburg built in the early 1990s. The building has several different tenants with different types of operations.
Assignment/solution
Ecopilot® was installed as an over-modulation of the existing system. The background to this was the identification of problems with system collaboration and the indoor climate.
Customer
Kungsleden
Building
EA Rosengrens Gata
Area
4.324
Installation year
2012
Building Framework
Concrete
Type of Building
Office
Savings
Heating: 25 kWh/m2
Carbon reduction
8 tonnes CO2/year
Yield
40%
40%
Yield on invested capital41%
Energy saving heating8
Reduction CO2 tonnes/yearResults
The heat consumption has reduced by approximately 40 per cent and at the same time the indoor climate has become more pleasant. Now the property’s systems do not step on the gas and break unnecessarily.
Energy classification
EA Rosengrens Gata now has an A-classification in accordance with the European standard for energy efficient buildings. This corresponds to less than 50 per cent of the new construction requirement for premises. Without an Ecopilot® installation, EA Rosengrens Gata would have a C-classification.